Designing solutions based on process engineering
At Granada City Council, according to a case documented by the IEEE Task Force on Process Mining (2020), delays in the files of the tax collection department were attributed to negligence by public employees. An analysis of how the work was really done, combining system data with interviews because some tasks were not recorded, revealed that the cause was something else: there were positions with signing responsibility whose absence nobody covered. The complete process had not been analysed, and the simplest explanation was to blame the people.
This is where process engineering becomes relevant: understanding how work operates before deciding what to change, and changing before automating. It is worth applying when a process is slow or generates a lot of rework, when it depends on what a single person knows, when automation is going to be introduced, or when regulations require traceability.
My aim with this article is to give an overview of process engineering: we will go through its five phases and what each one involves. In the upcoming instalments, we will look at the details.
Context helps us understand the moment we are in.
Thanks to artificial intelligence, automating is cheaper than ever, and it is also easier to automate things that do not need to be automated. A confusing, inefficient process that has been automated is still a confusing process.
The five phases of process engineering
1. Discovery
This involves reconstructing how the work is really done, based on facts rather than assumptions. System data, interviews with participants and observation are combined to establish the starting point: how long it takes, where the waits are, how much is repeated. Without that baseline, nothing can be measured objectively.
2. Modelling
This means capturing the process in a common language for business and technical teams, usually BPMN (Business Process Model and Notation), a standard notation that represents the process with symbols: start and end events, activities, decisions and who is responsible for each step. A good diagram should have a clear start and end, show the decisions and alternative paths, and make it clear who is responsible for each step.
3. Analysis and redesign
Here we identify where time, quality or money is being lost, simplify steps wherever possible and design the future state of the process. Improving one dimension usually makes another worse: gaining speed can affect quality, and gaining control can reduce flexibility (Reijers and Mansar, 2005).
Recent studies add two further objectives: people, in terms of training or resistance to change, and environmental impact (François et al., 2026). Not every improvement requires technology: removing unnecessary steps, reordering tasks or running them in parallel are improvements with a major impact.
4. Implementation
Once the process has been redesigned, the order of tasks is set according to priority or impact, along with what will be digitised and what will be automated. Exceptions never disappear completely, and new ones usually emerge over time, so it is necessary to define who resolves them.
5. Orchestration and continuous improvement
The process is run following very clear steps, and artificial intelligence must be used within explicit limits, with human review at sensitive steps. It is measured continuously, and the data is used to identify possible improvements. These improvements can be implemented efficiently through a defined process.
Conclusions: Basing decisions on data
Applied from the start of a project, process engineering reduces unnecessary investment, improves the control that regulations demand and makes it possible to base decisions on data rather than assumptions.
With a complete view of the process, its participants and its conditions, it is possible to improve time, quality, profitability and flexibility, knowing what is gained and what is given up with each decision. It is the difference between improving a process and moving the problem elsewhere.
It has a direct link to data engineering. The process defines what data needs to be recorded, who is responsible for it and which indicators will be measured. Without that definition, the data collected is whatever is easy to obtain rather than what matters, and this comes at a cost later: incomplete or inconsistent data leads to unreliable automations, and to business decisions based on a distorted picture of what is happening. That is what happened in Granada, where part of the work was not even recorded.
In the upcoming instalments, we will look at each phase inmore detail, starting with discovery.
